MEDIA
Recently ,converter valve of 6 inches 5000A/8500V thyristor developed independently by our company has been successfully passed the overload tests in ± 800kV UHVDC transmission from South Hami to Zhengzhou (referred as “Hazheng project”), the world’s largest HVDC transmission both in distance and capacity .
06

2013-11

TEC won the tender with traction system order for 180 vehicles in Nanning metro line 1. This is another significant breakthrough in new domestic urban rail market after TEC obtaining the first order in Southeast China, namely the traction system order for maintenance machines in Fuzhou metro line 1.
18

2013-10

Good news comes from North America! Times Electric USA LLC , by virtue of the outstanding performance and electronic product influence in North America, was awarded “Best of 2013 Erie-electronic equipment” in Pennsylvania USA
23

2013-09

TEC won 66 units of vacuum toilet system in 25T passenger train, marking the official application of vacuum toilet system in rail transit field.
08

2013-08

Following the good performance of first half year of 2013, TEC is awarded again a traction system order for 28 trains with 168 cars in Fuzhou Metro Line 1, marking our first independent traction system order in southeast China. It is reported that the whole Line, passing through central business district and connecting planned new development zone, is 29.184km long with 28.436km operating distance. The line will be important enough to be the busi...
23

2013-07

Recently, TEC won traction system order of 23 trains with 138 cars in Changsha Metro Line 1 PhaseⅠfollowing the success in Changsha Metro Line 2, in which not only integration of traction, signal and braking system but also the first breakthrough of signal and braking system are achieved.
08

2013-07

Recently, TEC successfully wins supplementary purchase orders of traction system project in Shenyang Metro Line 1 and Line 2, with value amounting to RMB 150 million. B type car of 3M3T is adopted in both projects.
03

2013-06

Recently, TEC won traction system order in Ningbo Metro Line 1 project Phase Ⅱ following the order in Ningbo Metro Line 2 project Phase Ⅰ, which reinforces TEC’s market position in Eastern China and makes great importance for its traction system in entering developed second-tier cities.
26

2013-05

Recently, TEC wins orders of traction system in Wuhan rail transit Line 3 stage-Ⅰand Line 4 stage-Ⅱwith value totaling RMB430 million. This marks a great breakthrough of TEC’s vehicle traction products in Wuhan market, further to consolidate and improve our market standing and competitive advantage in the rail transit industry.
FirstPrevious313233343536NextLastCurrent:32/36Total:319
  • Contact Us
  • (Zhuzhou) TEL:+86 731 2849 2157 FAX: +86 731 28491 394
  • (Hongkong) TEL: +852 2189 7268 FAX: +852 2189 7298
  • EMAIL: overseas@csrzic.com
  • ADD: Shidai Road,Shifeng District,Zhuzhou,Hunan,P.R.C ZHUZHOU
  • CRRC TIMES ELECTRIC CO.,LTD.
  • Postcode: 412001
 

©2005-2018 Zhuzhou CRRC Times Electric Co., Ltd. All Rights Reserved Private Policy