News&Events

Purchase Order of Sheng yang Metro Traction Braking System has been signed

Date:2008-03-20

Mar. 20th, we have signed the Purchase Order of Sheng yang Metro Traction Braking System. This is the first time that our city metro adopt home made core parts: traction driving system. The leader of National Development & Revolution committee, the leader of Sheng yang city, leader of China Railway transportation committee, the director of Sheng yang Metro Construction office, vice president of CSR, our director and president are attended the Signing ceremony.

This order includes 20 whole trains of type B2. Each of them is 3M3T, 120 sets of traction braking system and related devices and service in total. The supply arrange contain: traction driving and control system, air source and air braking system. The delivery term is from 2009 to the end of 2010.

Sept. 2007, we use self design system plan on which we have completely independent intellectual property rights to bid for the project. We got the first grade in the project biding. On the project related devices and service, we have short cycle, low cost, fast reaction advantages compared to the project whose technology is charged by westerners.

  • Contact Us
  • (Zhuzhou) TEL:+86 731 2849 2157 FAX: +86 731 28491 394
  • (Hongkong) TEL: +852 2189 7268 FAX: +852 2189 7298
  • EMAIL: overseas@csrzic.com
  • ADD: Shidai Road,Shifeng District,Zhuzhou,Hunan,P.R.C ZHUZHOU
  • CRRC TIMES ELECTRIC CO.,LTD.
  • Postcode: 412001
 

©2005-2018 Zhuzhou CRRC Times Electric Co., Ltd. All Rights Reserved Private Policy