News&Events

Assist Rail Transit Green Development, the company DC1500V lithium iron phosphate power battery is emerging!

Date:2022-08-08

The first batch of hybrid locomotives equipped with Zhuzhou CRRC Times Electric Co., Ltd..DC1500VV platform batteries have rolled off the production line in recent days, injecting green, low-carbon smart energy into rail transit to achieve the "Dual carbon" target.

3000 horsepower hybrid shunting locomotive off-line

On June 8, the 3,000-horsepower hybrid shunting locomotive (FXN3D) loaded with Zhuzhou CRRC Times Electric Co., Ltd. batteries (634 kwh) officially rolled off the production line at CRRC Dalian. The locomotive adopts the"Additional program" power system with the power battery as the core, which ensures the auxiliary charge of the power battery at the optimal economic speed. Compared with the traditional diesel shunting locomotive, its diesel engine has been greatly reduced from 24-hour running to only 2-hour running per day, thus achieving high fuel efficiency and low carbon emission reduction.

The first commercial HXN6 internal-electric hybrid locomotives went off-line

On June 9, the first commercial HXN6 internal-electric hybrid locomotives loaded with Zhuzhou CRRC Times Electric Co., Ltd. batteries (with a total installed capacity of 2,537 kwh) were successfully rolled off the production line at China Automotive Ziyang Co. . The locomotive has been fully upgraded from the original HXN6 internal-electric hybrid locomotive. The power source is composed of a high-safety liquid-cooled power battery pack and a diesel generator pack. It can save 30% to 50% of fuel consumption, reduce emissions of harmful substances by 40% to 80% and achieve low-carbon green power substitution for traditional diesel locomotive.

All of these recently rolled-out locomotives have one thing in common: they all Zhuzhou CRRC Times Electric Co., Ltd. lithium-iron phosphate batteries in the new DC1500V platform

Security advantage

The DC1500V Power Battery Platform Project has fully responded to the requirements of TJ/JW 124-129-2020 National Railway technical specifications since its inception, adhering to the core design goals of high reliability and high safety, in order to meet the rail traffic field to the power battery stringent application requirements. The Zhuzhou CRRC Times Electric Co., Ltd..DC1500VV platform has the following safety advantages over conventional power-cell platforms:

“Safety gene” is the foundation of the platform

The DC1500V platform Zhuzhou CRRC Times Electric Co., Ltd. adopts high quality lithium iron phosphate core, the cell has been used in many applications such as high temperature, high cold, high humidity, high altitude, high temperature difference, mountainous, rainy areas and super-large cities. Power cell system integration is deeply integrated with the company's decades-long core technology of rail transit electrical control, fully absorb the design experience of electric drive traction control, high-voltage electrical insulation, rail transit high-power equipment thermal management and big data intelligent diagnosis, etc. , endow the DC1500V battery platform with“Safety genes”.

Certified and unafraid of demanding application requirements

Currently, the Zhuzhou CRRC Times Electric Co., Ltd..DC1500VV platform for power cells and batteries PACK has completed all safety certification tests inTJWw 126-2020 andTJWw 127-2020, successfully passed the safety challenges of over-charging, over-discharging, short-circuiting, dropping, heating, external extrusion, acupuncture, seawater immersion, temperature cycling, low pressure, external burning, salt spray, thermal runaway and other extreme abuse conditions, can be described as“18 all kinds of martial arts,” to meet the stringent application of rail traffic vehicles.

Multiple guarantees ensure the safety and reliability of the platform

Adhering to the safety design concept of“Preventing hazards, blocking evolutionary path and reducing accident hazards”, the Zhuzhou CRRC Times Electric Co., Ltd..DC1500VV power battery platform has multiple security Shieldss”, including multi-level software protection, hard-line redundancy protection and active fire safety. Through multi-level security protection design based on software and Fuse, and adding hardware protection redundancy design, the platform can realize hardware protection and software control to construct double-layer security armor, the operation condition of the battery is controlled in the absolute safe range to realize the high safe operation of the battery. The centralized active fire extinguishing device with multiple fire early warning can extinguish the open fire within 90 seconds under the condition of thermal out-of-control, and stop the fire from reburning within 30 minutes, thus effectively blocking the fire evolution path, reduce the battery heat out of control harm degree.

In the future, the Zhuzhou CRRC Times Electric Co., Ltd. will continue to practice the role of the central government and enterprises in the sustainable development of carbon emission reduction

  • Contact Us
  • (Zhuzhou) TEL:+86 731 2849 2157 FAX: +86 731 28491 394
  • (Hongkong) TEL: +852 2189 7268 FAX: +852 2189 7298
  • EMAIL: overseas@csrzic.com
  • ADD: Shidai Road,Shifeng District,Zhuzhou,Hunan,P.R.C ZHUZHOU
  • CRRC TIMES ELECTRIC CO.,LTD.
  • Postcode: 412001
 

©2005-2018 Zhuzhou CRRC Times Electric Co., Ltd. All Rights Reserved Private Policy