News&Events

Resumption of Work and Production—6,000 Tons of H-Section Steel Delivered to Various Factories of CRRC

Date:2020-05-01

On February 26, a batch of H-section steel were being transported from Masteel Group's factories to CRRC's factories across the country through the smart logistics platform of CRRC Logistics Company. Large data analysis was used to successfully avoid epidemic areas and contribute to the resumption of production of CRRC. The total quantity of this batch of H-section steel reached 6,000 tons.

The H-section steel produced by Masteel Group is the main raw material for NX70 platform cars. The first batch of 6,000 tons of H-section steel is being produced in batches. Under the current situation of severe epidemic situation and poor road traffic, how to deliver raw materials safely and quickly to all production enterprises and ensure the timely supply of production materials for all enterprises is a prominent problem.

CRRC Nanjing Logistics, as one of the major carriers of H-section steel, by relying on its own advantages of smart logistics platform, integrating various transportation resources and planning transportation schemes in advance, has formulated the transportation supporting scheme combining road transportation + railway transportation + joint rail-and-water transportation to ensure the safe and rapid delivery of goods to all units.

News from CRRC https://www.crrcgc.cc/en/g7389/s10408/t309607.aspx

  • Contact Us
  • (Zhuzhou) TEL:+86 731 2849 2157 FAX: +86 731 28491 394
  • (Hongkong) TEL: +852 2189 7268 FAX: +852 2189 7298
  • EMAIL: overseas@csrzic.com
  • ADD: Shidai Road,Shifeng District,Zhuzhou,Hunan,P.R.C ZHUZHOU
  • CRRC TIMES ELECTRIC CO.,LTD.
  • Postcode: 412001
 

©2005-2018 Zhuzhou CRRC Times Electric Co., Ltd. All Rights Reserved Private Policy