/Portals/7/Uploads/Images/2017/6-30/636344147725744597.png

Metro Signaling

The Changsha Metro Line 2 stands as a reference for our metro signaling business. We provided signaling systems for the mainline and the sideline with total length of 22.08km, 1 control center, 19 stations, 1 depot, 16 trains for the phase 1, 1 training center, 1 maintenance center and the trial running line. The sidelines include cross track, turn-back track, stabling line, depot access track and liaison line with other lines. The daily traffic volume of phase 1 of Changsha Metro Line exceeds 250,000 people.
 

SIL2 ATS (Automatic Train Supervision) system developed by TEC for metro project application.

Zhuzhou CRRC Times Electric Co., Ltd.
All Rights Reserved Private Policy